I received a double whammy from Metricon yesterday - two invoices on the same day - one for Lock Up and one for Fixing. On the good side that means that all the bricks have been finished (yay) and that things have are progressing inside as well. On the downside those two invoices account for 45% of the construction price - the next loan repayment's going to hurt!

We met our SS up at the house last night. I was hoping to get a look around inside but the tilers were still on the job - they'd just finished grouting the tiles and washing away the excess so we couldn't go in.


I was so pleased to see the bricks finished. After all my worrying there wasn't a problem with the colour of the bricks and I really like the way the house looks. We're so glad that we mentioned that the half built portico pillar was too small, because the bigger size looks really good.


Peering through our bedroom window I could get a bit of a look at the tiling in our ensuite. All the floor and wall tiles have been completed and my spa has been installed. Shower screens are due to go in today - not sure when the basins go in.


Our SS has scheduled the rest of the things that need doing to complete the house and it looks like everything will be done by the end of October, so if all goes well handover should be around mid-November (touch wood) which allows time for any defects to be fixed.