Tuesday, October 12, 2010

So what's left?

The answer to that question is...not much.




We met our SS on site tonight and I was really keen to get a close up look at the tiles and the bathrooms and get a bit of an idea about what's left to do.



Firstly - the bathrooms. Really love the way they look. In the ensuite we chose to have the short wall of the shower (where the tapware is located) in a dark tile. The idea came from a Metricon promotional magazine, I know not everyone will love it, but we do.






All the electrical work is complete - we can now turn lights on! There was a small hiccup with the front door. The beautiful $450 long bar handle we selected wasn't installed, instead a standard lever door handle and lock were, so that means a new front door needs to be ordered, stained and installed. No biggie.

So what's left? Well we've chosen to install our own cooling, carpet and curtains after handover so all that is left is the installation of the shower screens, kitchen splash back and the pantry/linen cupboard/wardrobe fitouts and rendering the portico. The toilets and downpipes need to be installed - but we're doing those and they should happen within the next week. After that it's the touch ups and house clean and then it's on to quality control and inspections.

I started writing this post last Tuesday (12/12 and today is 18/10) and have only just had time to complete it. Since then the temporary fence has been removed, the undercoat has been applied to the portico, the bricks have been cleaned and a partial site clean completed. We're also in discussions with Metricon over the poor workmanship with the termite control and the slab. I will provide more details and pictures in my next post.