Saturday, October 23, 2010

Closer and closer

Thursday night I went up at the new house while a potential buyer inspected our current house. Hadn't seen any tradies there for quite a while so I got a pleasant surprise.


The portico has had two coats of render and is just waiting on the top coat which will have the colour in it. This was done about a week ago - I just haven't had a chance to post pictures. So far we're really happy with it. You can see our front door in the picture above - it still needs to be replaced due to the door handle issue.


The kids' mirrored robe doors have been installed and we think they look really good. We disagreed over the mirrored doors - I wanted the framed ones and Wade wanted the frameless. In the end we've gone frameless - I'll probably regret it because they only have a small handle for opening and closing but they do look good.
Excuse the poor quality photos - I had to take them through the windows. The shower screens and mirrors have also been installed. You can see that in the ensuite we've gone for two smaller mirrors with a bevelled edge, instead of one large one. Easy enough to change over if we decide we don't like it in a few years time.
All the fly screens have been installed and a bit of patch work has been done inside the house ready for the painters to arrive. The down pipes and toilets will go in on Monday (we're putting those in) so we're edging closer to the finish line.

Friday, October 8, 2010

Double Whammy

I received a double whammy from Metricon yesterday - two invoices on the same day - one for Lock Up and one for Fixing. On the good side that means that all the bricks have been finished (yay) and that things have are progressing inside as well. On the downside those two invoices account for 45% of the construction price - the next loan repayment's going to hurt!

We met our SS up at the house last night. I was hoping to get a look around inside but the tilers were still on the job - they'd just finished grouting the tiles and washing away the excess so we couldn't go in.


I was so pleased to see the bricks finished. After all my worrying there wasn't a problem with the colour of the bricks and I really like the way the house looks. We're so glad that we mentioned that the half built portico pillar was too small, because the bigger size looks really good.


Peering through our bedroom window I could get a bit of a look at the tiling in our ensuite. All the floor and wall tiles have been completed and my spa has been installed. Shower screens are due to go in today - not sure when the basins go in.


Our SS has scheduled the rest of the things that need doing to complete the house and it looks like everything will be done by the end of October, so if all goes well handover should be around mid-November (touch wood) which allows time for any defects to be fixed.