Friday, October 8, 2010
Double Whammy
Thursday, September 30, 2010
Pretty happy with the way it's all going so far. At the moment the tiles stretch from the garage internal access door all the way through the house, including the entry, kitchen/dining/family room, pantry bathrooms etc.
We've run out of bricks, so at the moment the bricking has come to a halt while we wait for three more pallets of bricks. One of the portico pillars is partially built, but will have to come down as it has been built too small. It's not a major problem and we probably could have left it, but we both felt the house would look better with the pillars the bigger size. Given all the dramas we have had with the bricks, we're very concerned that the new ones wont match the rest of the house!
Our SS has moved to a different area and we are the last house in this area that he is coordinating. In some ways that's good - he knows all the ins and outs of the job so far, on the down side there doesn't seem to be a lot of 'supervising' going on at the moment. Maybe that's normal? Everything seems to have really slowed down.
Tuesday, September 21, 2010
It's all coming together





Tuesday, September 14, 2010
Finally!
Sunday, September 5, 2010
The Brick Saga
Our SS and the Austral Bricks representative said that we were unlucky and unfortunately it was a bad batch of bricks, some had been in the kiln a lot longer than others resulting in the darker colour. Austral told us that it would be at least three weeks before another batch would be made and our SS suggested that we select a different brick.
The Austral rep dropped in some samples of similar bricks and we went back through all the brochures. There was nothing that we really liked so we called our SS and had a chat with him. The hold up with the bricks wasn't a major problem for Metricon because they couldn't find a bricky to do the job, all their usual guys were on other jobs.
The Austral rep came up with a solution. They would sort the bricks before they put them on the truck so that we had a consistent colour.
Here's what arrived.
We've now had a third lot of bricks delivered. By this stage we were quite wary of anything said by Austral. We looked over the bricks ourselves and there is still some variation between the pallets. The bricks are suppsed to be so similar that they don't need mixing.
On Wednesday Wade had a meeting on site with our SS and the Austral rep. They built a couple of 'walls' with the bricks to get an idea of how they would look. We gave our SS the go ahead to use them, he had a bricky lined up to start on Thursday.
Our SS rang us late Thursday to say that the bricky had been to check out the job and had decided that it was too big, he wasn't going to do it.At this point we were beginning to wonder if our house was ever going to be bricked (bearing in mind that the bricking was originally set for early July). The SS rang us on Friday to say that he had a bricky lined up to start on Monday and that he is someone that he has worked with for years and will do a good job.
So cross your fingers for us, hopefully I'll have some progress to show you on Monday.
Friday, August 13, 2010
And they all fall down
Tuesday, August 10, 2010
Plastered
In the picture above you can see the amount of variation in the brick. It's not Metricon's fault, we just got a bad batch. Austral tried to get the brickies to toss out the really dark ones, but with the bricks being wet it's incredibly difficult to tell which were too dark. Our SS did mention that we could let the bricking continue and then have the house rendered at the end, but we really preferred the bricks.
Our SS also mentioned that the kitchen floor will levelled this week, ready for tiling to start. Not sure when that is due but hopefully not for a few weeks yet. According to the engineers our slab needs to sit for at least three months before tiling commences.
Thursday, August 5, 2010
It's enough to make you cry

Tuesday, July 27, 2010
Latest happenings
Concrete boxing and reo has been set up in a couple of places where the house frame was overhanging the slab to support the brickwork. Our SS told us that the exposed reo will be fixed this week and the brickies are due to start tomorrow.
The plumbers have been and roughed in all the interior pipework. We were a bit surprised to find pipework that hadn't been properly clipped, but this is easily fixed before plastering begins. The duct work and heating unit have been installed - I'm really looking forward to having ducted heating next winter.
Our chippie has been on site to straighten walls and check that everything is OK.
The electricians were on site today running cables for the power points and lights. Due to the size and length of our house (and the associated electrical demands) a secondary power board is being installed in our linen cupboard. A bit disappointed with the locations of some power points, in many rooms we have two double power points on one wall. We thought that the outlets would be evenly spaced, both 600mm in from the adjoining walls, however one is right in the very corner and the other is about 600mm in. These aren't hard to fix before the plaster is done, but that's not how our electrical layout plan looks.
I'm really looking forward to seeing the progress the brickies make tomorrow and will definitely have photos. Our new camera has arrived but I ran out of daylight to get proper photos today.