Friday, August 13, 2010

And they all fall down

Well not quite - but all the previous bricking has been removed. The Austral Bricks truck has been there a couple of times to check out what needs doing to remove the bad lot. They'll all need to be restacked, wrapped in plastic and loaded back on the truck before our new bricks can be delivered. Not sure when that will happen.

Yesterday the last of the cornice went up. The plasterers have done a pretty good job, there are some bits that could be better (a dip where the cornice is joined - that type of thing), but overall not too bad.


You can see the channeling that has been cut in the floor for the electrical conduit. Our SS was as annoyed as we were about this. You can see the black marks on the floor outlining where the island bench will be. All the had to do was channel back to the bench (approx 300mm) and the same on the other side where the conduit comes out in the butlers pantry rather than level with the wall. As you can see they chose to go right across the floor, which was time consuming and unnecessary. Thankfully they haven't cut through any of the reo. It turns out that common sense isn't always common!

Tuesday, August 10, 2010

Plastered

Day 76. Our dodgy bricks were pulled down today - I don't have photos of that yet and I'm not sure I really want to see it. It was necessary but it still feels as though we're going backwards instead of forwards.

In the picture above you can see the amount of variation in the brick. It's not Metricon's fault, we just got a bad batch. Austral tried to get the brickies to toss out the really dark ones, but with the bricks being wet it's incredibly difficult to tell which were too dark. Our SS did mention that we could let the bricking continue and then have the house rendered at the end, but we really preferred the bricks.

On a happier note - the plaster is just about complete. It's all up and the cornices were all cut today and should be put up tomorrow.




Our SS also mentioned that the kitchen floor will levelled this week, ready for tiling to start. Not sure when that is due but hopefully not for a few weeks yet. According to the engineers our slab needs to sit for at least three months before tiling commences.